Walk into the children’s area at Cleveland Library today and the Redlands Coast is everywhere around you… in the light, the materials, the small details that make the space feel like it belongs on the corner of Bloomfield and Middle Street rather than in any library, anywhere. icatchers designed and themed the children’s area for Redland City Council between December 2025 and April 2026, transforming a tired section of the library into an engaging, interactive and welcoming space for younger visitors and the broader community with a genuine sense of place, and all whilst keeping the doors open to the public throughout.

The library sits close to Moreton Bay, surrounded by waterways, bushland and an established local community, and the brief reflected that. Redland City Council didn’t just want a functional space. They wanted a children’s area that felt like Cleveland: modern and welcoming, but unmistakably local.

The project came to us through our track record delivering library environments for other councils. That experience, paired with the strength of our design proposal, gave the council the confidence to hand us their vision for this space.

Understanding the Brief

Libraries have changed and they’re no longer just places to borrow books, instead they’re community spaces for reading, studying, working, meeting, learning and connecting with technology. The children’s area needed to sit comfortably within a library that supports all of that, while still feeling distinctly of its place.

The surrounding environment gave us plenty to work with. From the Cleveland Point Lighthouse, Moreton Bay’s marine life, the local mangroves and forests and of course the energy of Cleveland’s markets and community life all fed into the design direction. Indigenous references were woven in too, adding a deeper sense of history and connection to Country. The goal was never a generic library interior, it was a space where these local influences felt considered and authentic, not decorative.

Our Solution

The real challenge wasn’t finding local references as Cleveland has no shortage of them. It was weaving a lighthouse, a bay, a mangrove forest, a market and Indigenous storytelling into one cohesive space, rather than a scattered set of themed corners.

The lighthouse gave us an obvious anchor point. Moreton Bay and its coastline opened the door to marine forms and sea-life motifs. The mangroves and surrounding bushland added texture and warmth. And the spirit of Cleveland’s local markets (busy, colourful, unpretentious) all shaped how open and accessible the space needed to feel, rather than formal or clinical.

The design also had to work hard for everyone who walks through the door from children, families, students, workers, older residents and people simply looking for somewhere comfortable to sit and read. That meant every visual decision had to hold up to durability, everyday wear and constant use, not just look good on the day it opened.

Working Within the Budget

As with most large scale community projects, the ambition of the original concept had to meet the reality of the available budget. Rather than stripping features out and losing the impact of the design, we worked closely with the council and library team to find where individual elements could be simplified, redesigned or approached differently all without sacrificing the overall effect.

That’s the real skill in a commercial fitout like this, since it’s not about the most expensive materials or keeping every line of the original concept intact. It’s understanding what actually creates the desired effect, and finding the smartest way to deliver it.

Challenges and Solutions

The biggest practical challenge was that the children’s area wasn’t an empty shell waiting for a fitout, as it sat within a working library that couldn’t simply shut its doors for four months.

That meant rethinking how construction happens around real people: staff at their desks, visitors browsing shelves, deliveries arriving, kids’ storytime running on schedule. The new space also had to integrate with the existing library and the neighbouring areas and their various uses. Access, noise and site activity all had to be scheduled around that daily rhythm. A significant amount of the build happened after hours, once the last visitor had left for the day.

None of it would have been possible without tight coordination and constant communication with the council and library teams, who understood exactly what needed to happen and when.

How the Cleveland Library Project Came Together

The design process began in December 2025. Even with our background in library projects, Cleveland still needed its own close reading of the building, its users, its location and the council’s specific requirements.

Working through consultation and refinement with the council and library team, we balanced a genuinely demanding brief of a modern, functional space that reflected Cleveland’s identity, incorporated environmental and cultural references appropriately, held up in a busy public facility, and stayed within budget.

From there, the project moved through planning, creative development and onsite execution, with each stage building on the last, with construction scheduled carefully around the library’s ongoing operation.

Bringing Cleveland Library to Life

The result is a children’s area that feels like it could only belong in Cleveland, a space shaped by its surroundings rather than dressed up with them. Getting there took some real problem solving along the way, from budget to logistics but what’s left is a refreshed, practical space ready to support the Cleveland community for years to come.

Share on social media:

Share on facebook
Share on twitter
Share on linkedin